Thousands of references and satisfied clients all over the world.

Our last jobs

  • Specific Response Plan (PPI) - 2018 - QUARON - Haubourdin (59) SEE
    Specific Response Plan (PPI) - 2018
    QUARON - Haubourdin (59)

    Establishment of a public warning system and an internal operation plan (POI) including an omni-directional 1800 Watts siren.

  • Specific Response Plan (PPI) - 2018 - AIR LIQUIDE - Feyzin (69) SEE
    Specific Response Plan (PPI) - 2018
    AIR LIQUIDE - Feyzin (69)

    Establishment of a population alert system and an internal operation plan (POI) including a 600 Watts omni-directional siren.

  • Industrial sonic cleaning system SONOFORCE IKT230/170 - EGGER - Rambervillers (88) SEE
    Industrial sonic cleaning system SONOFORCE IKT230/170
    EGGER - Rambervillers (88)

    Target area for cleaning: Burner.

    Result : Improved fouling in the lower conical section of the burner. Zone composed of refractory concrete. Spray the sound on dirty areas / plates. Quick release of soot safely.

  • Industrial sonic cleaning system SONOFORCE IKT230/170 - PRAYON - St Clair du Rhône (38) SEE
    Industrial sonic cleaning system SONOFORCE IKT230/170
    PRAYON - St Clair du Rhône (38)

    Target area for cleaning: Smoke sheath between Furnace and Atomizer.

    Result : Depending on the manufacturing recipes, net improvement of fouling in the sheath. Improves the flow of the internal flow. Increase in yield.

  • Specific Response Plan (PPI) - 2017 & PPI Extension - 2018 - City of Soignolles en Brie (77) SEE
    Specific Response Plan (PPI) - 2017 & PPI Extension - 2018
    City of Soignolles en Brie (77)

    Implementation in 2 phases of a system of alert to the population including a 1200 Watts siren and a 600 Watts siren. The latter is installed in addition to compensate for the expansion of the PPI coverage area.

  • Specific Response Plan (PPI) - 2017 - City of Saint Jean Cap Ferrat (06) SEE
    Specific Response Plan (PPI) - 2017
    City of Saint Jean Cap Ferrat (06)

    Establishment of a population alert system and an internal operation plan including a 600 Watts omni-directional siren.

  • Special Plan for Safety (PPMS) - Agricultural School - Naturapolis (36) 2016 SEE
    Special Plan for Safety (PPMS) - 2016
    Agricultural School - Naturapolis (36)

    Establishment of a population alert system including an omni-directional 600 watt siren.

  • Special Plan for Safety (PPMS) - 2016 - Polytechnique School - Palaiseau (92) SEE
    Special Plan for Safety (PPMS) - 2016
    Polytechnique School - Palaiseau (92)

    Establishment of a population alert system including an omni-directional 1800 Watts siren.

  • emergency warning sirens PPI - EDF Civaux SEE
    Individual Intervention Plan (PPI) – 2013
    EDF CIVAUX (86)

    Replacement of the cast aluminium horn of the siren located at the north of the nuclear power plant, to improve the audibility of the signal and the warning signal to the population of a technological disaster.

  • Industrial sonic cleaning system SONOFORCE IKT 230/170 - CHO-POWER plant SEE
    Industrial sonic cleaning system SONOFORCE IKT 230/170
    CHO-POWER plant – Morcenx (40) (Renewable Energy - Biomass)

    Target area for cleaning: Syngas cooling boiler (horizontal fin tubes)

    Result : thanks to the fin tubes cleaning, we've removed the dirt in the heart of the last exchanger and thus increased the availability of the boiler.

  • Emergency population warning siren for the city of Saint-Georges D'Oléron SEE
    Population Warning and Information System (SAIP) – 2011
    Saint-Georges D'Oléron town hall (Harbour master's quarter of Boyard Ville - 17 FRANCE)

    As part of the SAIP program (Ministry of Interior Program), an electronic warning siren has been installed at the Harbour master's quarter in BOYARDVILLE to alert the population in case of natural disaster (Tsunami, flood, storm). This siren is connected to the SAIP system.

  • Industrial sonic cleaning system SONOFORCE IKT 230/170 - SIAAP plant SEE
    Industrial sonic cleaning system SONOFORCE IKT 230/170
    SIAAP plant – Achères (78) (waste water and sludge treatment of the city of Paris)

    Target area for cleaning: tube heat exchanger

    Result: decrease of the plant's shutdown for cleaning operations from one every month to one every six months
    Now, the heat exchanger is always clean and is able to work at its maximum speed.

  • Emergency population warning sirens, city of Port-des-Barques SEE
    Population Warning and Information System (SAIP) – 2012
    City of Port-des-Barques (17)

    After the study of major risks (Flood, Earthquake), the city has installed on top of its water tower an emergency population warning electronic siren.

  • PPI warning siren. Specific Response Plan (PPI) ARKEMA (65) – 2010 SEE
    Specific Response Plan (PPI) – 2010
    ARKEMA (65 - France)

    Set up of an Emergency Populations Warning Siren and of an Internal Operation Plan (POI), with two control boards placed in the control room of the security department of the site and one siren ECN 3000 on Arkema plant coupled to three existing sirens of the city (La Barthe Neste, Lannemezan Capvern. Zone PPI of 8km)

  • PPI siren - MSSA – Specialty metals in Pomblière - MOUTIERS (73) SEE
    Specific Response Plan (PPI) – 2003
    MSSA – SPECIALTY METALS IN POMBLIERE - MOUTIERS (73)

    Set up of an Emergency Population Warning System with a secured digital radio control center, two outdoor sirens and three internal systems in various buildings of the plant. PPI area is 1 km for the siren situated in the plant area in Bourg St Maurice Valley, and 2.5 km for the other siren that covers the cities of Moutiers and Salins les thermes.

  • Pneumatic siren of Vernéjoux SEE
    Dam failure for hydraulic project.
    CNR – PNEUMATIC SIREN FOR DAM

    To warn of a dam failure, the operator has installed pneumatic sirens all along the flood wave formation (sirens installed at 1 km, 3 km, 5 km, 10 km and 15 km). The warning signal is specific for Water Projects.

  • industrial cleaning system SONOFORCE IKT 230/220 - Raffinerie TOTAL Normandie SEE
    Industrial Sonic Cleaning system SONOFORCE IKT 230/220
    TOTAL Refinery Normandy

    Target area for the cleaning: one tube heat exchanger.

    Result: 20% improvement of the performance of the heat exchanger at the gas outlet.

  • Industrial Sonic Cleaning System INSONEX 200. SEE
    Industrial Sonic Cleaning System INSONEX 200.
    Aluminium processing plant

    Target area for the cleaning: 6 Silos.

    Details: each silo is equipped with a single head resonance tube (valve) that successively supplies the 6 tubes. Air injection heads are designed specifically to supply various INSONEX at the same time.

    Result: substantial decrease of the plant's shutdown for cleaning operations.