Specific Response Plan (PPI) – Raffinerie du Midi – Coignières (78)
Raffinerie du Midi – 2020 Coignières (78)
(*valid in France only)
A rising and falling sound 3 times 1 minute 41s separated by a short silence
30 seconds continuous sound (On the Prefectoral order)
A rising and falling sound 1 time 1 minute 41s (1st cycle of the NATIONAL WARNING SIGNAL only)
Raffinerie du Midi – 2020 Coignières (78)
Industrial sonic cleaning system SONOFORCE IKT230/170 ADISSEO St Clair du…
Industrial sonic cleaning system SONOFORCE IKT230/170 et IKT150/360 TV Mauritius…
Specific Response Plan (PPI) QUARON – 2018 Haubourdin (59)
Specific Response Plan (PPI) AIR LIQUIDE – 2018 Feyzin (69)
Industrial sonic cleaning system SONOFORCE IKT230/170EGGERRambervillers (88)
Engineering, study, consulting and installation of acoustic solutions
PPI/POI Emergency Population Warning Sirens, sound and air cleaning systems.